
Demolition & dismantling
Industrial dismantling, cutting, baling and full-site clearance.
Industrial demolition that pays material back
For us demolition is not clean-up but material recovery: the metal content of a selectively dismantled production line, tank or hall is worth money, which reduces the cost of the demolition, or can even exceed it. After an on-site survey we give a fixed offer: either we pay for the recovered material, or we charge a net fee. The work is done with our own mobile shear and baler.
- ·Industrial machinery dismantling
- ·Tank, silo and pipework cutting
- ·Full-site clearance
- ·Mobile shear and baling
- ·Selective demolition with material recovery
Demolition is where the value of clean separation shows up. We dismantle for material recovery, not for speed, typically returning 15–30% more value than conventional demolition.
- 01Site walkOur colleague surveys, photographs and estimates quantities on site.
- 02Fixed offerEither we pay you for recovered material, or quote a net fee.
- 03ExecuteCutting, sorting, removal, we hand the site back swept clean.
- 04Material recoveredAs much value as possible back to you, as little as possible to landfill.
Frequently asked questions
- How much does an industrial demolition cost?
- You get a fixed offer after the on-site survey. If the value of the recovered metal covers the work, we may even pay you for the demolition.
- Do you also dismantle smaller production lines?
- Yes, we work from single machine dismantling all the way to clearing a complete site.
Tell us what you have.
We'll tell you what it's worth.
Send tonnage and material, get a binding offer the next working day, weighed and paid on site at our Székesfehérvár weighbridge.
